EDUCATION, HOSPITALITY
EDUCATION, HOSPITALITY
EDUCATION, HOSPITALITY

Beaumont School Dining Hall & Kitchen Renovation

Beaumont School Dining Hall & Kitchen Renovation 

Beaumont School Dining Hall & Kitchen Renovation

Prioritizing choice, while maximizing speed and efficiently, the renovation of Beaumont School’s dining hall looked beyond merely replacing updated furniture, finishes, and equipment, and instead reconfigured the wing to emulate a collegiate dining experience.
—Always By Design

Prioritizing choice, while maximizing speed and efficiently, the renovation of Beaumont School’s dining hall looked beyond merely replacing updated furniture, finishes, and equipment, and instead reconfigured the wing to emulate a collegiate dining experience.
—Always By Design

Prioritizing choice, while maximizing speed and efficiently, the renovation of Beaumont School’s dining hall looked beyond merely replacing updated furniture, finishes, and equipment, and instead reconfigured the wing to emulate a collegiate dining experience.
—Always By Design

Web_Template_COVER-HORZ-02 beaumont

The first phase of implementation of Beaumont School’s campus-wide Master Plan prioritizes a transformational renovation of the dining hall and kitchen, which dates to the mid-1960s.

The accordion folded concrete roof structure—a single plane serving as both ceiling and roof—initially precluded conventional ductwork installation. Designers ingeniously employed a VRF system to circumvent this limitation by strategically concealing large fresh air diffusers behind decorative grates, replacing the previously unventilated space, introducing air conditioning and enhanced ventilation.

Web_Template_COVER-HORZ-03 beaumont

The design went beyond mere functionality, incorporating aesthetic nuance. Linear lighting trace the unique accordion ceiling's underbelly, creating a soft nocturnal glow visible from the street. Full-height glass windows connect the dining area to an adjacent courtyard, infusing the interior with natural light and verdant context.

A neutral, earthy color palette was carefully selected to harmonize with vibrant plant life and student uniforms. Diverse seating options—including courtyard-facing lounge areas, small group configurations, and traditional long tables—provided flexible dining environments that prioritized student choice and comfort during their compact 30-minute lunch period.

CLIENT
CLIENT

Beaumont School

Beaumont School 

LOCATION

Cleveland Heights, OH

SIZE

14,300 SF

14,300 SF 

SERVICES
FIRM ROLE

Master Planning
Architecture
Interior Design
MEP Engineering

Related Work